Manufacturing and quality

Preparing an apparel request for quotation

A useful RFQ gives manufacturers a common basis for comparison. If each supplier assumes different fabrics, quantities or packaging, the lowest number may describe a different product. Make the scope visible before comparing prices.

Apparel development materials and garment study

Start with the product requirement

Identify the styles, technical documents, materials and intended quantities. Separate confirmed specifications from open development questions. Explain whether the request concerns samples, a potential bulk order or both.

Compare the relevant alternatives

Ask for sample and setup charges to be shown separately. Request the currency, unit basis, quotation validity and commercial delivery terms. Avoid comparing an ex-factory figure directly with a delivered quotation.

Write a clear specification

Include the proposed size and color assortment, branding, packing and destination information available at this stage. Where those details are unresolved, ask the supplier to state its assumptions clearly.

Review the physical result

Compare quotations line by line rather than only at the total. Note exclusions, substitutions and conditional prices. Ask suppliers to explain meaningful differences before requesting further price revisions.

Record the decision

Create a comparison sheet with one column for unanswered questions. Confirm the final scope in writing before authorizing payment or production, and keep the agreed quotation linked to the approved specification.

Separate a proposal from an approval

Keep development recommendations, confirmed specifications and production authorization distinct. Record the current document version, responsible contact and unresolved questions in writing. A supplier’s preliminary answer may depend on materials, quantity or timing that has not been settled. Ask for those conditions explicitly before planning around the answer. Use approved samples and agreed requirements to guide checks rather than broad descriptions of quality. When a change is proposed, assess its technical and commercial effects before allowing it to become the new production reference.

TAKE THIS INTO YOUR NEXT DISCUSSION

Your buyer checklist

  • Request currency, unit basis and delivery terms.
  • Separate sample, setup and optional packing charges.
  • Ask suppliers to list all assumptions and exclusions.

Turn the decision into your brief.

Choose the pieces you are considering and record your fabric, color, size and development priorities.

Build your project brief ↗Explore the style library ↗

THE MAKING OF MOVEMENT

A closer look at the craft.

01 · Fabric02 · Pattern03 · Sample04 · Make

The making-of film is planned for this placement. Creative imagery and verified factory footage can be added in the next production stage.

Explore full style →

Reference pricing, MOQ and timing are confirmed for your specified order.

YOUR SHORTLIST, SIDE BY SIDE

Find the right mix.